Complete the text with a suitable passive form of the verb in brackets.
blocked drains shut gallery link
a multi-million pound underground tunnel connecting two of edinburgh's art galleries (1) (close) for two weeks so that blocked drains which have dogged the building from the outset can be fixed. the repair work (2) (estimate) to cost around £100,000 but it is unclear who will foot the bill. major losses (3) (expect) at the museum and at the gallery restaurant, which
(4) (house) in the link and (5) (force) to shut whilst the work (6) (carry out). the head of buildings said it was likely that the fault had occurred while the tunnel (7) (construct) 'it probably happened while it (8) (build) because we have had blockage problems since it opened. we (9) (tell) it will cost around
£100,000 - who will pay for it will be the issue.' a spokeswoman for the national galleries said: 'everything (10) (do) to ensure minimal disruption to visitors. many of the educational workshops and events (11) (accommodate) elsewhere in the galleries. the national gallery of scotland and the royal scottish academy building (12) (not affect) by the work, and will open as normal throughout.' the work to the faulty drainage system at the weston link, which (13) (only complete) in august 2004, will take eight weeks from mid-february until the start of march.